sales@shivalikventures.com  022-35155550
  • Overview
  • Location
  • Google Map
  • Floor plan - 1 BHK
  • Floor plan - 2 BHK
  • Typical Unit plan - 1 BHK
  • Typical Unit plan - 2 BHK
  • Flat Amenities
  • Common Amenities
  • Gallery
  • Current Status
  • Project FAQs
  • Bank Tie-ups


Well connected to all that is important:

Place Distance
Bandra station 0.7 KM
Khar station 0.3 KM
BKC 1.7 KM
Airport 2.5 KM
Western express 0.2 KM
SCLR 2 KM

Bandra has always been one of the most prestigious localities of Mumbai city and Gulmohar Avenue is nestled in this much sought-after abode. Bandra is known for its unmatched surroundings, seamless connectivity and non-stop progressive social infrastructure.

From Bandra North, you can literally cycle to all the nearby and significant locations. Your home will just be a stone’s throw away from Mumbai’s most designated corporate hub – BKC. You will enjoy quick access to key roads, highways, the best schools, colleges and sports training facilities. You will also be surrounded by the finest shopping hubs, restaurants and hospitals. You might even bump into your favourite film star in Bandra or witness your favourite cricketers at the MIG or MCA grounds.


RERA Registeration No.:
P51800014036

maharerait.mahaonline.gov.in

RCC & BRICK WORK
  • Seismic resistant RCC frame structure.
FLOORING
  • Vitrified flooring in living, kitchen & bedroom. Anti-skid flooring in bathrooms.
Windows
  • Granite window frame with aluminium anodized sliding windows.
DOORS
  • Fire retardant flush type door in wooden frame with chrome plated brass fittings, night latch for main door, peephole, safety chain, decorative handle & heavy duty doorstopper.
  • Internal wooden door with flush door shutter & granite frame.
ELECTRIFICATION
  • Concealed electric ISI copper wiring with circuit breaker.
  • Provision for telephone, lights, fans, four 15mph plug points for heavy duty equipment.
  • Shutter plug to avoid accidental contact along with standard quality modular switches.
  • Provision for split AC.
BATHROOM
  • Wall mounted WC with flush valve.
  • Concealed plumbing for WC, shower, geysers & wash basin.
  • Premium water closet & wash basin, hot & cold mixer point for shower.
  • Good quality aluminium louvers in bath & WC.
KITCHEN
  • Granite kitchen platform with standard quality stainless steel sink.
  • Ceramic tiles dado above kitchen platform upto beam bottom.
WALL FINISH
  • Putty finish wall with acrylic emulsion paint in all rooms.
Specifications
  • Decorative entrance lobby
  • Underground tank, overhead water tank & fire-fighting tank with adequate storage capacity
  • Modern fire-fighting equipment with sprinklers
  • Children’s play area
  • Convenient shopping
  • Multipurpose hall
  • Society office
  • Gymnasium
  • Main gated entry
  • Automated passenger elevator, 2 automated car lifts
  • Peripherial planting
  • Back-up generator electric supply for emergency services
  • Rain water harvesting
  • STP
  • Intercom facility
  • Electrical substation
  • 2 & 4 wheeler car parking

Tuesday, 09 July 2019


Thursday, 04 April 2019


Friday, 30 November 2018


Monday, 31 October 2018


Monday, 15 October 2018


Wednesday, 21 March 2018


Sunday, 3 Feb 2018


Q 1. Is the land/plot vacant?

Yes

Q 2. Whether title is clear for the land?

Yes

Q 3. Whether plan is sanctioned from Competent Authority?

Yes

Q 4. What are the chances of the plans getting altered after receiving all the permissions?

Plans won’t be changed after receiving all the permissions

Q 5. Can we see the buildings I.O.D. and Commencement Certificate?

Yes

Q 6. When you will get the O.C. for the building?

As mentioned in the agreement

Q 7. When the Agreement will get registered?

After paying 10% of the Agreement Value

Q 8. Which documents we have to submit?
  • PAN
  • AADHAR
  • Photographs
Q 9. Have you got all required Environmental Clearances & NOCs?

Yes

Q 10. Does the Agreement for Sale have to be registered?

Yes

Q 11. What will be the height of the building?

49.71 mt (G + 15)

Q 12. When the Construction starting?

Construction has commenced since January 2018

Q 13. Date of first slab casting of my wing/building

December 2018

Q 14. Date of finishing construction and obtaining OC

It will be as per the completion of the wing

Q 15. Date of handing over possessions

It will be as per the completion of the wing.

Q 16. How many flats can I purchase in this scheme?

As many as you want

Q 17. When will the society be formed?

When 51% of the total number of units will be sold.

Q 18. What if there is a delay in the possession of the flat?

As per RERA, you will be paid penalty

Q 19. Is the project RERA complied & registered under RERA?

Yes.

Q 20. What is the total area that you are going to develop?

6617.78 Sq. Mt.

Q 21. Number of floors, units per floor?

15 floors, 4 units per floor

Q 22. When do I have to pay the booking amount and how much?

Booking amount has to be paid when you plan to buy the flat. The amount will be Rs. 51,000 /-

Q 23. Terms and Conditions you mentioned specifications may change as per the project requirement. But you have to construct as per plan showed at the time of booking. Will it be OK?

There will be no changes

Q 24. Due to unforeseen reason if you are unable to allot us apartment you will refund the amount with @ 12% interest and any delay we have to pay you by 18% interest. Is it a fair deal?

The interest is SBI MCLR interest rate + 2 % for both parties

Q 25. What is Advance Maintenance Charges? And how many years' maintenance chargers it will cover?

"Adv. Maintenance charges covers common areas light bill, watchman, liftmen salaries, water charges etc.12 months advance maintenance charges will be collected"

Q 26. Will I get benefits of Capital gain if I sell the purchased flat after 2 years from the date of Sale agreement even at the time of these sale the possession is still not handed over to me?

Yes

Q 27. Can a NRI invest in immovable property in India & what documents are required for acquisition of property?

Yes a NRI can invest but he need to possess all the required documents as suggested by RBI guidelines

Q 28. What documents are required from an Estate Agent in order to sell a developer’s flat?

The Estate Agent needs to enter into an agreement with the developer in order to be able to sell developers flat. He needs to be RERA registered and should provide a valid RERA ID. Once this procedure is completed the Estate Agent is eligible to sell flats and will get a standard commission on sale of each flat.

APF Num: MUM/17/5298
APF Num: P1070220
APF Num: CPPC/MSRO/2017-18/APF005
APF Num: VIRPAS011924
APF Num: MUM-0118-445

Disclaimer : This is not an offer, an invitation to offer and/or commitment of any nature. This contains artistic impressions and stock images for illustrative purpose and no warranty is expressly or impliedly given that the completed development will comply in any degree with such artist's impression as depicted. All terms and conditions of sale of flat, specifications and amenities of the flat/project shall be as per the final agreement between the Parties. Recipients are advised to use their discretion in relying on the information/amenities described / shown herein. All distances mentioned are aerial distances. ** The No EMI Till Possession & Flexi Payment scheme is subject to the sanction of the home buyer’s loan from financial institution / banks offering this scheme. * T & C Apply.

Enquire Now